Incremental forming
Incremental forming of DP steelThe aim of this project is the manufacturing of calottes for screw fixing on Dual Phase profiles. In this reseach, the basic industrial feasibility of forming high strength steels (thickness of 1.5 mm) with Single-Point-Incremental-Forming (SPIF) process is to be examined. |
Project duration:01.06.2014 - 31.03.2017 Researcher:Mr. Dipl.-Ing. Thai Dang |